Summary
RPS Planning Transport and Environment (RPS) were commissioned to undertake a Flood Risk Assessment (FRA) for the laying of electrical cables from three offshore wind farms to an existing electrical substation at Walpole. Centrica Renewable Energy Limited (CREL) will need to extend the substation at Walpole. National Grid (NG) will also be required...