2014, DNV GL, Lincs Offshore Wind Farm, Cable Protection Assessment

2014, DNV GL, Lincs Offshore Wind Farm, Cable Protection Assessment

Topic categories:

Engineering Design

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Dec 2014 - Dec 2014

Development:

Lincs

Publication date:

May 2021

Round:

2

Organisation:

DNV GL

Phase:

Post-construction

Description

Lincs Wind Farm Limited (the "customer") has approached DNV GL to discuss potential cable remedial works in the Lincs offshore wind farm ("Lincs") which are planned to be carried out in 2015. Lincs has been in commercial operation since September 2013, The main method of protection for the array and export cables was burial, but...