Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2014, EGS, Lincs Offshore Wind Farm, Turbine LS28 Clearance Survey

2014, EGS, Lincs Offshore Wind Farm, Turbine LS28 Clearance Survey

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Jun 2014 - Jun 2014

Development:

Lincs

Publication date:

May 2021

Round:

2

Organisation:

EGS

Phase:

Post-construction

Description

After completion of the depth of burial survey of the Lincs Array Cables project, and the Export Cable
survey, EGS (International) Ltd, on behalf of Centrica, undertook a Side-Scan Sonar (SSS) and
Multibeam (MBES) clearance survey of the no cable zones (500m by 500m) around WTGs LS28 (on the
Lincs site) and ID24 (on the Inner Dowsing Site). The are...