Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2010, EGS, Lincs Offshore Wind Farm, Pre-Construction Baseline Survey Works

2010, EGS, Lincs Offshore Wind Farm, Pre-Construction Baseline Survey Works

Topic categories:

Geophysical

Geotechnical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Aug 2010 - Sep 2010

Development:

Lincs

Publication date:

May 2021

Round:

2

Organisation:

EGS

Phase:

Pre-construction

Description

EGS (International) Ltd was contracted to undertake a geophysical survey of the LINCS OWF and cable route corridor in order to help determine the nature and distribution of broad scale sediment types and identify seabed features. The results of the geophysical survey were used to identify potential Annex I habitats and also to inform the benthic ha...