Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2015, EGS, Lincs Offshore Wind Farm, LS28 Turbine Clearance Survey

2015, EGS, Lincs Offshore Wind Farm, LS28 Turbine Clearance Survey

Top Categories:

Geophysical

Description

EGS (International) Ltd, on behalf of Centrica, undertook a Side-Scan Sonar (SSS) and
Multibeam (MBES) clearance survey centered on the no cable zones (500m by 500m) around
WTGs LS28 (on the Lincs site), and ID16 and ID24 (on the Inner Dowsing Site). The areas
surveyed were identified by Centrica for the upcoming works on the aforementioned turbines
and respond to the need to have a jack-up vessel in the locality to complete the works. This
series details the operations and results of the survey around all turbines. Please note the data provided within this series only covers the Lincs site, whilst the report covers both the Lincs and Inner Dowsing Offshore Wind Farms.

Dataset

Download All

Deliverables Spreadsheet

Charts