Summer 2013, Osiris Projects and CMACS, Lincs Offshore Wind Farm, Post-Construction Geophysical and Benthic Surveys

Summer 2013, Osiris Projects and CMACS, Lincs Offshore Wind Farm, Post-Construction Geophysical and Benthic Surveys

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Oct 2013 - Jan 2014

Development:

Lincs

Publication date:

May 2021

Round:

2

Organisation:

Summer 2013, Osiris Projects and CMACS, Lincs Offshore Wind Farm, Post-Construction Geophysical and Benthic Surveys

Phase:

Post-construction

Description

Osiris Projects were commissioned in October 2013 by Centrica Renewable Energy
Ltd. (CREL) to carry out post-construction surveys on the LINCS Offshore Wind Farm
(OWF) and associated export cable route. There were six key elements of the surveys:
 LINCS OWF repeat pre-construction benthic baseline survey
 LINCS OWF drill arising mounds benthic su...