Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2007-2012, ECON, Lincs Offshore Wind Farm, Pre-construction Ornithological Baseline Surveys

2007-2012, ECON, Lincs Offshore Wind Farm, Pre-construction Ornithological Baseline Surveys

Topic categories:

Birds

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Apr 2007 - Nov 2012

Development:

Lincs

Publication date:

May 2021

Round:

2

Organisation:

ECON

Phase:

Pre-construction

Description

Centrica commisionned ECON/ RPS to conduct thi pre-construction monitoring at the Lincs offshore wind farm site over a study area covering the site (plus a 1 km buffer) and adjacent control area of similar size and transect length. A total of 41 boat-based surveys were carried out from December 2007 until November 2010 inclusive.
The main focus of ...