Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2015, EGS, Lincs Offshore Wind Farm, Post Construction Hydrographic, Geophysical and Benthic Survey

2015, EGS, Lincs Offshore Wind Farm, Post Construction Hydrographic, Geophysical and Benthic Survey

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Oct 2015 - Nov 2015

Development:

Lincs

Publication date:

May 2021

Round:

2

Organisation:

EGS

Phase:

Post-construction

Description

EGS International Ltd (EGSi) were contracted by Centrica Renewable Energy Limited (CREL) to
undertake the 2015 post construction (Year 3) hydrographic and geophysical surveys of the
Lincs and L and ID (Lynn and Inner Dowsing) windfarm array cable routes. Additionally, a benthic
survey was required for the Lincs OWF post construction survey.
This se...