Winter 2013, Osiris Projects, Lincs Offshore Wind Farm, Post-Construction Geophysical Survey

Winter 2013, Osiris Projects, Lincs Offshore Wind Farm, Post-Construction Geophysical Survey

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Apr 2013 - May 2013

Development:

Lincs

Publication date:

May 2021

Round:

2

Organisation:

Winter 2013, Osiris Projects, Lincs Offshore Wind Farm, Post-Construction Geophysical Survey

Phase:

Post-construction

Description

Osiris Projects were commissioned in April 2013 by Centrica Renewable Energy Ltd.
(CREL) and Renewable Energy Systems Ltd. (RES) to carry out post-construction
surveys on the LINCS Offshore Wind Farm (OWF) and associated export cable route.

The survey was completed under LOGIC Terms and Conditions. The survey works
conducted by MV Chartwell were carried out between 4th and 8th May 2013. The
survey works conducted by MV Freja were carried out between 16th and 26th April
2013. Multibeam and side scan sonar were carried out.