Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2011, EGS, Lincs Offshore Wind Farm, Collector and Array Cables

2011, EGS, Lincs Offshore Wind Farm, Collector and Array Cables

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Aug 2011 - Sep 2011

Development:

Lincs

Publication date:

May 2021

Round:

2

Organisation:

EGS

Phase:

Pre-construction

Description

The Lincs OWF Project involves the development of an offshore wind farm off the coast of Skegness (Lincolnshire) by Centrica Renewable Energy. Preconstruction bathymetric and geophysical survey data was required along the LINCS array cable and collector cable routes. Survey lines were divided into 2 categories: Collector Cables, connecting circuits...