2014, EGS, Lincs Offshore Wind Farm, Export Cable and Array Cable Survey

2014, EGS, Lincs Offshore Wind Farm, Export Cable and Array Cable Survey

Top Categories:

Geophysical

Description

EGS (International) Ltd, on behalf of Centrica undertook this survey The LINCS Offshore Wind Farm is located 8km off the Lincolnshire coast at Skegness, just north of the North Sea area known as “The Wash”. The total route length of the array cables is 69.68km with the two export cables measuring approximately 47km each. Water depths across the site vary between 8m – 16m Chart Datum (CD). The wind farm consists of 75 3.6MW turbines with monopile foundations and a substation. An overview of the survey area is provided in Figure 1 & 2. The primary objectives of the survey were to: - Determine the Depth of Burial (DoB) of the array and collector cables until a point where the cable is in at least 0.5m of reliable burial - Determine the DOB of selected infield shallow burial areas at LS 30-31, 29-30, 36-37, 38- 37 (3 sections), 52-53, 38-56, 61-42, 62-63, 45-46, 44-45, 43-44 and 67-68

Dataset

Download All

Charts and Associated Shapefiles

Route Position Listings

Report

Download All

Array Cables Results Report

Export Cable Exposures Results Report

Operations Report