Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2008, Wessex Archaeology, Lincs Offshore Wind Farm, Review of Archaeological Exclusion Zones

2008, Wessex Archaeology, Lincs Offshore Wind Farm, Review of Archaeological Exclusion Zones

Top Categories:

Archaeology

Description

Wessex Archaeology (WA) was commissioned by Centrica Renewable Energy Limited (Centrica) to conduct a review of 28 archaeological sites in advance of the construction phase of the Lincs offshore wind farm export cable route. The proposed Lincs offshore wind farm area lies on the eastern (seaward) side of the consented Lynn and Inner Dowsing wind farms, approximately 8-12km off the coast of Lincolnshire. Two export cables will connect the wind farm to the grid, with landfall to the east of the mouth of the River Nene.

Report

Download All

Report

Charts