Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2011, EGS, Lincs Offshore Wind Farm, Drill Arising Mound Survey

2011, EGS, Lincs Offshore Wind Farm, Drill Arising Mound Survey

Topic categories:

Benthic Ecology

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Oct 2011 - Nov 2011

Development:

Lincs

Publication date:

May 2021

Round:

2

Organisation:

EGS

Phase:

Pre-construction

Description

A total of six mounds were selected for survey, two are located within the L&ID wind
farms, created in 2007 adjacent to turbines LN02 and LN29 and named Mound A and
Mound B respectively. The four other mounds, labelled Mound C to F are located
within the Lincs wind farm at turbines LD61, LS62, LS43 and LS44 respectively and
were created in duri...