Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2017, EGS, Lincs Offshore Wind Farm, Lincs LS23 and LS65 Clearance Survey 2017

2017, EGS, Lincs Offshore Wind Farm, Lincs LS23 and LS65 Clearance Survey 2017

Topic categories:

Geophysical

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

May 2017 - May 2017

Development:

Lincs

Publication date:

May 2021

Round:

2

Organisation:

EGS

Phase:

Post-construction

Description

EGS International Ltd (EGSi), were contracted by Centrica Renewable Energy Limited (CREL) to
undertake a side scan sonar (SSS) and multibeam (MBES) clearance survey centred on the no cable
zone (400m x 400m) adjacent to WTGs LS23 & LS65 at the Lincs Offshore Wind Farm. The surveys were
required to support the safe emplacement of a jack-up vessel adjacent to the WTG for maintenance
purposes.
This series details the operations and results of the survey around all turbines.