Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2003-2004, CMACS Ltd., London Array Offshore Wind Farm, Benthic Sampling using Beam Trawls, Otter Trawls and Day Grabs in the Thames Estuary during 2003 and 2004

2003-2004, CMACS Ltd., London Array Offshore Wind Farm, Benthic Sampling using Beam Trawls, Otter Trawls and Day Grabs in the Thames Estuary during 2003 and 2004

Topic categories:

Benthic Ecology

Sedimentology

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Apr 2003 - Feb 2004

Development:

London Array

Publication date:

May 2021

Round:

2

Organisation:

CMACS Ltd.

Phase:

Pre-construction

Description

This project details trawl surveys and benthic grab surveys that were carried out by CMACS at London Array Offshore Wind Farm site.

Trawl surveys were completed during the following periods: April 21-27 2003, July 7-15 2003, December 6-11 2003 and February 20-26 2004.  On each occasion trawls were carried out at forty three locations around the st...