2005, E.ON, London Array, Design Brief for Onshore substation

2005, E.ON, London Array, Design Brief for Onshore substation

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2021

Collection date:

May 2005 - May 2005

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

The construction and operation of the proposed new substation is an integral
part of the offshore wind farm development. An Environmental Statement has
been produced which describes and assesses the impacts of the development
as a whole. This design brief has been prepared to provide a description of the
components of the onshore substation and ind...

Categories:
Onshore
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'