Welcome to the Beta site. Beta means that you’re looking at the first version of the new Marine Data Exchange.
We’ll be continually testing and improving the site, so please let us know how we’re doing by getting in touch here

2004, E.ON, London Array Offshore Wind Farm, Proposed Overhead Line Works at Cleve Hill

2004, E.ON, London Array Offshore Wind Farm, Proposed Overhead Line Works at Cleve Hill

Topic categories:

Onshore

Last series update:

May 2021

MEDIN approved

Industry:

Wind

Collection date:

Jun 2005 - Jun 2005

Development:

London Array

Publication date:

May 2021

Round:

2

Organisation:

E.ON

Phase:

Pre-construction

Description

This project examines the environmental effects of the proposed overhead line connection works at Cleve Hill near Faversham, Kent for the London Array offshore wind farm.  The environmental assessment was carried out by National Grid.

National Grid has applied to the Department of Trade and Industry (DTI) under Section 37 of the Electricity Act 19...