2005, Institute of Ecology and Environmental Management, London Array, Impact Assessment Methodology

2005, Institute of Ecology and Environmental Management, London Array, Impact Assessment Methodology

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

June 2023

Collection date:

March 2005 - March 2005

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

The Environmental Assessment methodology follows the requirements set out in the draft ecological impact assessment methodology of the Institute of Ecology and Environmental Management (IEEM 2002). The first step is to identify the ecological value of the area under consideration, from Internationally important statutory areas to non-statutory area...

Categories:
Birds
Environmental Statements
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Data Highlights
1
Reports
1

Data Highlights


Explore the wealth of the data gathered in the 2005, Institute of Ecology and Environmental Management, London Array, Impact Assessment Methodology


5

Institute of Ecology and Environmental Management Impact Assessment Methodology