2012, Osiris Projects, Inch Cape Offshore Wind Farm, Export Cable Route Survey

2012, Osiris Projects, Inch Cape Offshore Wind Farm, Export Cable Route Survey

Powered by: CES
Don't show this

What is a series page?

Download MEDIN file

Last series update:

May 2026

Collection date:

August 2012 - September 2012

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

March 2025

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Summary

Osiris Projects were commissioned in August 2012 by Senergy Survey & GeoEngineering (S&G), on behalf of Inch Cape Offshore Ltd, which is a partnership between Repsol Nuevas Energias UK (RNE) and EDP Renewables (EDPR), to carry out a geophysical and geotechnical survey along the Inch Cape Offshore Wind Farm (ICOWF) export cable route corridor. This ...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Data Highlights
1
Datasets
8
Reports
3

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

Bathymetry Data

GIS Data

Magnetometer Data

Nav Files

RoxAnn AGDS Data

Seismic Data

Side Scan Sonar Data

Trackplots

Select a Package from the list on the left to see more information about it