Summary
In March 2011 EMU Limited was commissioned by Meygen Limited to assess the hydrodynamic conditions within the proposed Inner Sound Tidal Energy Site. Two acoustic instruments were deployed in the Inner Sound for 30 days. A Nortek 600 kHz Acoustic Wave And Current Profiler (AWAC) was used to produce a current profile of the whole water column and as...

