2011, DHI, Inner Sound, Coastal Processes Modelling

2011, DHI, Inner Sound, Coastal Processes Modelling

Summary

DHI has been commissioned by MeyGen to provide assistance in an Environment Impact Assessment (EIA) in the Inner Sound area, Pentland Firth, Scotland, United Kingdom. The purpose of the present EIA is to identify the potential impacts arising from the operation of two different arrays of tidal power generators in the Inner Sound area. The potential impacts in term of hydrodynamic, wave and morphological conditions have been studied through the use of numerical model developed by DHI. The present technical note presents the results of the performed tide, wave and morphological modelling as well as a description of the models including model setup and calibration. The hydrodynamic and wave modelling has been carried out simultaneously using DHI’s MIKE 21 coupled model. Using a coupled model allows simulating the mutual interaction between waves and currents, which is of interest in areas with both strong currents and waves.
Categories
Coastal Processes
Development
Inner Sound
Industry
Tidal
Phase
Pre-construction
Organisation
DHI
License
Marine Data Exchange Terms of Use

Data & downloads

Datasets