2010, MMT, Islay Offshore Wind Farm, Marine (Geophysical, Hydrological and Geotechnical) Survey
Summary
MMT was commissioned to undertake geophysical, hydrological and geotechnical surveys of the Islay (and Kintyre) wind farm site. The surveys took place between July 6th - September 26th 2010.
The survey includes a complete bathymetric survey, a reconnaissance study to provide an overview of seabed surface conditions (as well as subsurface) and a geotechnical sampling survey.
Data & downloads
Datasets
