2012, Xero Energy, Argyll Array, Connection Solution and Route Design - Onshore and offshore cables

2012, Xero Energy, Argyll Array, Connection Solution and Route Design - Onshore and offshore cables

Powered by: CES
Don't show this

What is a series page?

Download MEDIN file

Last series update:

October 2024

Collection date:

February 2012 - March 2012

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

October 2024

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Summary

XE has been contracted as the electrical consultant to assist the process in determining the optimal electrical transmission solution and cable route for the grid connection of AAOWF. This work has been done in coordination with Royal Haskoning (RH) as the environmental consultant assessing the environmental constraints, and with Engineering Techno...

Categories:
Onshore
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Data Highlights
1
Reports
1

Data Highlights


Explore the wealth of the data gathered in the 2012, Xero Energy, Argyll Array, Connection Solution and Route Design - Onshore and offshore cables


6

Xero Energy, Argyll Array, Connection Solution and Route Design Grading