2013, Royal Haskoning, Kyle Rhea Tidal Stream Array, Environmental Management Plan Marine Mammals

2013, Royal Haskoning, Kyle Rhea Tidal Stream Array, Environmental Management Plan Marine Mammals

Summary

This document outlines an Environmental Management Plan (EMP) to mitigate disturbance impacts (potential for barrier effect) on European Protected Species (EPS) species (cetaceans) during Geotechnical works associated with the Kyle Rhea Tidal Stream Array Project The mitigation measures presented here are specifically aimed at minimising risk of an offence of disturbance to EPS i.e. cetaceans, during the geotechnical investigations. Guidance published by JNCC (2008) on deliberate disturbance of EPS, as well as minimising risk or injury or disturbance from seismic surveys (JNCC, 2010a) and pile driving (JNCC, 2010b) has been used in drafting this document.
Categories
GeotechnicalMarine Mammals
Development
Kyle Rhea
Industry
Tidal
Phase
Pre-construction
Organisation
Royal Haskoning DHV
Available in this series
1 Report

Data & downloads

Reports