2012, Marine Current Turbines Ltd., Kyle Rhea Tidal Stream Array, Site Conditions Summary
Summary
Data & downloads
Reports
Data Highlights
Related Pages
2013, Royal Haskoning, Kyle Rhea Tidal Stream Array, Environmental Management Plan Marine Mammals
This document outlines an Environmental Management Plan (EMP) to mitigate disturbance impacts (potential for barrier effect) on European Protected Species (EPS) species (cetaceans) during Geotechnical works associated with the Kyle Rhea Tidal Stream Array Project The mitigation measures presented here are specifically aimed at minimising risk of an offence of disturbance to EPS i.e. cetaceans, during the geotechnical investigations. Guidance published by JNCC (2008) on deliberate disturbance of EPS, as well as minimising risk or injury or disturbance from seismic surveys (JNCC, 2010a) and pile driving (JNCC, 2010b) has been used in drafting this document.
2012, Subacoustech Environmental Ltd., Kyle Rhea Tidal Stream Array, Assessment of Underwater Noise
An assessment of the levels of underwater noise associated with the installation and operation of tidal turbine array at the Kyle Rhea site has been carried out in order to determine the potential impact on marine species. Estimates have been made of potential impact zones around the array based on previously recorded data of similar operations. For all species of fish the data indicate that will be no cumulative effects between adjacent turbines. For species of marine mammal, where the impact ranges are predicted to be larger, there are likely to be some cumulative effects between the turbines. For harbour porpoise the majority of the Kyle Rhea site will be insonified by levels in excess of 90 dB ht , resulting in a strong avoidance reaction, however in fast flowing waters such as Kyle Rhea, it is not uncommon for background flow noise in excess of 90 dBht for harbour porpoises.
2012, ISVR Consulting, Kyle Rhea Tidal Stream Array, Biological and Human Noise Impact
This report provides an assessment of the biological and human noise impact of the array based on noise source models and noise propagation models that are described in section 2. The raw data for the analysis of noise sources is derived from measured data taken on the 1.2MW Seagen turbine at Strangford Lough; this comprised data sets acquired by Kongsberg and by ISVR, supplemented by data acquired by ISVR under a TSB funded project and data on construction noise measured by Subacoustech Ltd]. A semi-empirical underwater noise propagation model has been derived from the same data sets to predict the sound propagation to large distances.
2012, Headland Archaeology Ltd., Kyle Rhea Tidal Stream Array, Cultural Heritage Baseline Assessment
The purpose of the report is to identify any sites of cultural heritage significance that may be affected within and in proximity to the proposed development, and to outline the archaeological potential of the marine and terrestrial environment in which the development is proposed. This technical report presents the results of an Offshore and Onshore Cultural Heritage Baseline Assessment, incorporating an archaeological desk-based assessment; archaeological assessment of geophysical data; and an archaeological assessment of geotechnical data for the Kyle Rhea Tidal Array. The offshore assessment has established that there are no Designated Wrecks or other offshore cultural heritage assets with legal designations within the Immediate Study Area (ISA).
2012, SKM Enviros, Kyle Rhea Tidal Stream Array, Scope of Seascape, Landscape and Visual Assessment
SKM Enviros (managed by Royal Haskoning) has been commissioned by Sea Generation Kyle Rhea Ltd. (Marine Current Turbines) to prepare the Seascape, Landscape and Visual Impact Assessment (SLVIA) for a proposed array of marine current turbines to be positioned within Kyle Rhea. Sea Generation Kyle Rhea Ltd. has undertaken a thorough evaluation of the resource potential against technical, commercial and environmental criteria. Based on these criteria, the proposed site has been identified as being appropriate for the proposed marine current turbine development. This note has been prepared to highlight the key aspects of the scope of the assessment to be considered as part of the Seascape, Landscape and Visual Impact Assessment (SLVIA). These points are based on an analysis of the proposed development, its context and the feedback received from The Highland Council and Scottish Natural Heritage in relation to the original scoping exercise.
2012, Envision Mapping Ltd., Kyle Rhea Tidal Stream Array, Benthic Video Survey
The purpose of this present survey was to provide detailed seabed habitat and species information for the Kyle Rhea Tidal Array project, allowing characterisation of the seabed as part of the Kyle Rhea Tidal Array Environmental Impact Assessment (EIA) to support the applications for statutory consents. The characterisation will support an assessment of potential impacts of the proposed development on the seabed environment. The specific objectives of the study were to carry out a video survey to characterise the seabed within the study area in terms of distribution and abundance of marine habitats and communities, identify habitats or species of conservation importance and determine the substrate type at all locations sampled.
2012, Royal Haskoning, Kyle Rhea Tidal Stream Array, Intertidal Survey
Royal HaskoningDHV have been commissioned by MCT to assist in applications for consent of the project and as part of this support are conducting an Environmental Impact Assessment (EIA) for the Project. This document reports on the intertidal survey conducted by Royal HaskoningDHV which will be used to inform the EIA on the landfall cable route. This survey was completed in conjunction with an Extended Phase 1 Survey (Royal HaskoningDHV, 2012a) which assesses the terrestrial habitats inshore of the intertidal survey.
2011-2012, PARTRAC, Kyle Rhea Tidal Stream Array, ADCP Deployment
Partrac Ltd was contracted by Marine Current Turbines to undertake collection of metocean data (currents, waves and water level) in Kyle Rhea, at four locations north of the point of the Kyle Rhea ferry crossing. Four instrumented, ballasted bed-frames each comprising a 600 kHz RDI acoustic doppler current profilers (ADCP), were deployed at the four sites during the period 15th and 16th January 2012. Recovery operations were completed 60 days later on the 16th and 18th March.
2012, Royal Haskoning, Kyle Rhea Tidal Stream Array, Environmental Statement
As part of their on-going development programme, Sea Generation (Kyle Rhea) Ltd proposes the installation of an array of tidal turbines for the commercial production of electricity in Kyle Rhea. The combined generation capacity of the array will be up to 8MW, comprising of four SeaGen tidal turbine devices, with the capacity of each device of 2MW. This array represents a natural progression in development, following the successful installation and operation of a single SeaGen device in Strangford Lough, Northern Ireland, the world’s first commercial tidal turbine. The ES is submitted as part of the consent application for the Project, as required under European, UK and Scottish legislation. The EIA is designed by working closely with the Regulator, Marine Scotland and their advisor, Scottish Natural Heritage (SNH) to ensure it will provide the information needed for an informed consenting decision to be made. The EIA for the Project began in 2009, with collation of available information to identify the likely impacts and data gaps, to define which specific surveys and other studies would be required to inform the EIA. A request for a Scoping Opinion was submitted to Marine Scotland in 2010 and circulated with key stakeholders to gain early feedback on the approach to EIA. In addition, consultation has been ongoing with Marine Scotland and SNH to discuss the progress of the EIA and supporting studies, ensuring that it meets their requirements.
2011, Coastal Science Ltd., Kyle Rhea Tidal Stream Array, 2D Hydrodynamic Model, Construction and Preliminary Calibration
In terms of suitability for deployment of their tidal generation devices MCT has requested development of the high resolution Coastal Science Kyle Rhea hydrodynamic model, including small scale variations within the area of interest, by incorporating high resolution multi-beam bathymetry and ADCP time series data. It is considered that the present status of the model is such that it represents a suitable tool for further hydrodynamic characterisation of the area of interest at this stage, and as dictated by project requirements. Further calibration and validation will give added confidence to the model predictions.
2012, Natural Research Projects Limited, Kyle Rhea Tidal Stream Array, Year 1 Birds Technical Report
This report presents the findings of the first year of bird surveys undertaken at Kyle Rhea to inform the EIA of the proposed Kyle Rhea Tidal Array. Although marine mammal and basking shark were surveyed as part of the same programme of fieldwork, the results of for these species are reported separately (Year 1 Marine Mammal and Basking Shark Report). The survey work is on-going and it is planned to complete to two full years of baseline characterisation studies.
2010, Cathie Associates, Kyle Rhea, Geotechnical Desk Study
The purpose of this report is to describe the geology in the proposed tidal array area and identify any potential hazards to the installation of the turbine foundations. The study identified the following potential risks: water depth; seabed topography; dyke; variable rock strength; shipping; UXO. Two principle rock types are present within or immediately adjacent to the proposed site.