2013, Arcus, Methil, Fife Energy Park Offshore Demonstration Wind Site Project Environmental Monitoring Programme

2013, Arcus, Methil, Fife Energy Park Offshore Demonstration Wind Site Project Environmental Monitoring Programme

Powered by: CES
Don't show this

What is a series page?

Download MEDIN file

Last series update:

September 2026

Collection date:

November 2013 - November 2013

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

September 2026

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Summary

This Project Environmental Monitoring Programme (‘PEMP’) has been produced to comply with the requirements set out in the conditions of the Fife Energy Park Offshore Demonstration Wind Turbine (FEPODWT) (‘the Development’) Consent issued under Section 36 of the Electricity Act 1989 (Reference 022/OW/SEM-10). The PEMP will be a ‘live’ document provi...

Categories:
Environmental Statements
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

Report

Select a Package from the list on the left to see more information about it