2013-2014, Fugro Alluvial Offshore Ltd., Neart na Gaoithe Offshore Wind Farm, Geotechnical Survey

2013-2014, Fugro Alluvial Offshore Ltd., Neart na Gaoithe Offshore Wind Farm, Geotechnical Survey

Summary

Mainstream Renewable Power Limited (Mainstream) is currently developing the Neart Na Gaoithe (NNG) offshore wind farm site and export cable corridor in Blocks 25/19, 25/24, 25/25 and 33/4 of the UK sector, North Sea. Fugro Alluvial Offshore Limited (FAOL) was contracted by Fugro Geoconsulting Limited (FGCLTD) on behalf of Mainstream Renewable Power Limited (Mainstream) to perform a geotechnical site investigation at the NNG site to provide soils information to assist in the development of the proposed export cable route and main array.
Categories
Geotechnical
Development
Neart na Gaoithe
Industry
Wind
Phase
Pre-construction
Organisation
Fugro Alluvial Offshore Limited
Available in this series
4 Datasets, 4 Reports