2013-2014, Fugro Alluvial Offshore Ltd., Neart na Gaoithe Offshore Wind Farm, Geotechnical Survey

2013-2014, Fugro Alluvial Offshore Ltd., Neart na Gaoithe Offshore Wind Farm, Geotechnical Survey

Powered by: CES
Don't show this

What is a series page?

Download MEDIN file

Last series update:

June 2026

Collection date:

October 2013 - November 2014

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

January 2025

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Summary

Mainstream Renewable Power Limited (Mainstream) is currently developing the Neart Na Gaoithe (NNG) offshore wind farm site and export cable corridor in Blocks 25/19, 25/24, 25/25 and 33/4 of the UK sector, North Sea. Fugro Alluvial Offshore Limited (FAOL) was contracted by Fugro Geoconsulting Limited (FGCLTD) on behalf of Mainstream Renewable Power...

Categories:
Geotechnical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Data Highlights
1
Datasets
4
Reports
4

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

2013, Fugro GeoConsulting, Neart na Gaoithe Offshore W...

2014 Neart na Gaoithe Offshore Wind Farm Geotechnical S...

2014, Fugro GeoConsulting, Neart na Gaoithe Offshore Wi...

Cone Penetrometer (CTP) AGS data

Select a Package from the list on the left to see more information about it