2013-2014, Fugro Alluvial Offshore Ltd., Neart na Gaoithe Offshore Wind Farm, Geotechnical Survey

2013-2014, Fugro Alluvial Offshore Ltd., Neart na Gaoithe Offshore Wind Farm, Geotechnical Survey

Powered by: CES
Don't show this

What is a series page?

Download MEDIN file

Last series update:

February 2025

Collection date:

October 2013 - November 2014

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

January 2025

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Summary

Mainstream Renewable Power Limited (Mainstream) is currently developing the Neart Na Gaoithe (NNG) offshore wind farm site and export cable corridor in Blocks 25/19, 25/24, 25/25 and 33/4 of the UK sector, North Sea. Fugro Alluvial Offshore Limited (FAOL) was contracted by Fugro Geoconsulting Limited (FGCLTD) on behalf of Mainstream Renewable Power...

Categories:
Geotechnical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
4
Reports
4