Summary
For the Neart na Gaoithe offshore wind farm project, an offshore floating lidar was deployed between April 2014 and January 2015. The unit was installed at the Neart na Gaoithe Offshore Wind Farm (NNG) site on the 20th April 2014. Exact co-ordinates are Latitude 55°08.704' N and Longitude 01°25.159' W. Decommissioning took place on the 17th January...