2011, Osiris Projects, Robin Rigg Offshore Wind Farm, Post-Construction Geophysical Survey

2011, Osiris Projects, Robin Rigg Offshore Wind Farm, Post-Construction Geophysical Survey

Summary

Osiris Projects were commissioned in January 2011 by E.ON Climate and Renewables to carry out bathymetric and side scan sonar surveys at the Robin Rigg offshore wind farm. The survey was completed under E.ON Terms and Conditions, defined in the document dated 24th January 2011 for Contract Reference RR-MC-OPS-124. The surveys were carried out between 23rd January and 4th March 2011. The survey covered the main turbine area and the export cable route.