2011, Osiris Projects, Robin Rigg Offshore Wind Farm, Post-Construction Geophysical Survey

2011, Osiris Projects, Robin Rigg Offshore Wind Farm, Post-Construction Geophysical Survey

Powered by: CES
Don't show this

What is a series page?

Download MEDIN file

Last series update:

October 2025

Collection date:

January 2011 - March 2011

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

May 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Summary

Osiris Projects were commissioned in January 2011 by E.ON Climate and Renewables to carry out bathymetric and side scan sonar surveys at the Robin Rigg offshore wind farm. The survey was completed under E.ON Terms and Conditions, defined in the document dated 24th January 2011 for Contract Reference RR-MC-OPS-124. The surveys were carried out betwe...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
3
Reports
2