The Beatrice Offshore Windfarm Project commissioned UXO surveys of numerous locations across the offshore site in order to provide confidence that no UXO objects existed prior to undertaking a geotechnical survey campaign. The UXO surveys were undertaken in 2013, 2014 and 2015 and covered likely turbine locations and locations nearshore at the export cable landfall location. The initial surveys were geophysical and carried out by Fugro EMU (2013 and Nearshore, 2015) and Fugro Survey BV (2014). Following the completion of the geophysical surveys the data and reports were passed to 6Alpha Associates to be assessed and UXO sign-off certificates were produced. The survey deliverables included high-resolution bathymetry, sidescan and magnetometer data. The deliverables from 6Alpha include sign-off certificates for every location and GIS data showing Object Contact locations and exclusion zone buffers.
Series2014-2015, Fugro, Beatrice, UXO Survey Campaign
The Beatrice Offshore Windfarm Project commissioned UXO surveys of numerous locations across the offshore site in order to provide confidence that no UXO objects existed prior to undertaking a geotechnical survey campaign. The UXO surveys were undertaken in 2013, 2014 and 2015 and covered likely turbine locations and locations nearshore at the export cable landfall location. The initial surveys were geophysical and carried out by Fugro EMU (2013 and Nearshore, 2015) and Fugro Survey BV (2014). Following the completion of the geophysical surveys the data and reports were passed to 6Alpha Associates to be assessed and UXO sign-off certificates were produced. The survey deliverables included high-resolution bathymetry, sidescan and magnetometer data. The deliverables from 6Alpha include sign-off certificates for every location and GIS data showing Object Contact locations and exclusion zone buffers.
2014-2015, Fugro Geoconsulting, Beatrice, Geotechnical Completion Campaign
Fugro GeoConsulting Limited was contracted to BOWL to perform the geotechnical completion campaign at the Beatrice Offshore Wind Farm site. The geotechnical survey was performed to obtain soils information to assist in the design and installation of wind turbine generators along with the associated meteorological mast structures, offshore substation platform and export cables. An advanced geotechnical survey was completed as part of the geotechnical completion campaign. The advanced geotechnical survey was performed from the geotechnical drilling vessels MV Gargano from 3 October to 24 October 2014 and MV Greatship Manisha from 14 November to 27 November 2014. The remainder of the geotechnical completion campaign was performed from the geotechnical drilling vessels the MV Gargano from 25 March to 31 May 2015 and the MV Greatship Manisha from 25 March to 16 May 2015 in accordance with instructions received from BOWL.
2013, Fugro, Beatrice, Interim Geotechnical Survey
Fugro GeoConsulting Limited (Fugro) was contracted to BOWL to perform an interim geotechnical survey at the Beatrice Offshore Wind Farm site to obtain soils information to assist in the design and installation of wind turbine generators along with the associated meteorological mast structures, offshore substation platform and export cables. The first phase of the work was performed from the geotechnical drilling vessel MV Bucentaur from 5 September to 18 September 2013 and the second phase of the work was performed from the geotechnical drilling vessel MV Gargano from 27 September to 4 December 2013 in accordance with instructions received from BOWL.
Series2013, Fugro, Beatrice, UXO Survey Campaign
Fugro EMU were commissioned to undertake a survey and provide high-resolution bathymetry, sidescan and magnetometer data in order to allow the production of UXO sign-off certificates prior to the commencement of geotechnical operations. The original survey scope consisted of 40 sites, 150 m x 150 m in size. An additional 5 sites were later added to the survey scope. The project commenced with the mobilisation of the RV Discovery on the 25th July 2013. Mobilisation continued until the 31st July 2013 when the vessel transited to Wick, Scotland. Operations commenced on the 5th August and continued on a 24-hour operations basis until completion of the additional survey areas on the 6th September 2013.
2012-2016, Beatrice Offshore Wind Farm Ltd., Beatrice, Wind Data
Wind data was captured by the Beatrice Offshore Wind Farm Ltd (BOWL) project using LiDAR devices placed on the Jacky and Beatrice Alpha oil platforms in the Moray Firth. These platforms are situated to the south of the wind farm development area, Jacky within 0.5km and Beatrice Alpha within 10km of the site. The purpose of this data collection is to provide information to inform the calculation of the energy production estimate (EPE) for the wind farm. The wind data capture was performed using Leosphere Windcube V1 and V2 LiDAR devices. Leosphere Windcube V1 and V2 devices were located on the Beatrice Alpha oil platform and a Windcube V2 was located on the Jacky platform. The data included within this series was captured between 30/11/2012 (Beatrice Alpha V1) and 03/05/2016 (Jacky V2 and Beatrice Alpha V2). Also included are installation and service reports in the form of pdfs. Raw data supplied in .sta file format. Cleaned data supplied in Text document format.
Series2011, Gardline and Senergy, Beatrice, Export Cable Corridor Geophysical Survey
The geophysical survey of Beatrice Offshore Wind Farm Export Cable Corridor was undertaken by Gardline Geosurvey, commissioned by Senergy Survey & Geoengineering and carried out between 25th May and 15th June 2011. The purpose of the survey was to assist in the installation of the export cables from the Beatrice Offshore Wind Farm to the landfall situation on the southern shore of the Moray Firth, adjacent to Portgordon. The scope of the route survey was to obtain the following along the proposed corridors: - determine water depths reduced to LAT - identify seabed features and obstructions - determine the seabed sediments and sub-seabed lithology, topographical and geological features that could impact on the satisfactory installation and trenching of the cable such as wrecks, boulders, exposed bedrock, seabed gas seepage, pockmarks, adverse gradients, sand waves, slumping and channelling - determine the physical and engineering properties of the seabed sediments The following route surveys were required: - Survey of the Beatrice Site Approach Zone - Survey of the Routes between the Beatrice Start Point (SP) and the 2 Landfall locations (Options A&B) The Beatrice Site Approach Zone polygon was surveyed in its entirety using single and multibeam echo sounders, sidescan sonar, sub-bottom profiler and magnetrometer with the primary survey lines running in an approximate northeast/southwest orientation. Survey line spacing was 100m. In addition, two secondary orthogonal lines were run. Due to the engineering requirements on the cable installation, the width of the cable route corridor surveyed was dependent on the water depth. The cable route centrelines were acquired first utilising single and multibeam echo sounders, sidescan sonar, sub-bottom profiler and magnetrometer. This was done in order to plan the required line spacing for the route corridor. The Gardline vessel MV Ivero surveyed to the 10m water depth contour along both Route Options A and B. The nearshore approaches within the 10m contour were acquired by the Titan Environmental Surveys Ltd vessel Tital Endeavour. Equipment used during survey - Single and multi-beam echo sounder, sidescan sonar, pinger, magnetometer, vibrocore and CPT equipment The proposed Beatrice Export Cable Routes A and B are 64.769km and 64.654km long respectively. The survey corridor width and number of survey lines varies according to water depth. Along the proposed route, water depths vary between 0.0m and 95.8m LAT. No infrastructure is present within the route corridor; however there is existing infrastructure within the vicinity of the route. The seabed was sampled by means of a vibrocorer and cone penetometer. These samples were used to assist interpretation of sonar and shallow geophysical data. Tidal elevations have been derived using post-processed GPS observations. The sounding datum specified for this project was LAT. A dual channel sidescan sonar system was used to scan the seabed to either side of the ship's track, to locate and identify seabed obstructions and to investigate seabed soil properties and boundaries. One moderate analogue seismic system was deployed to investigate and map shallow soil units. The seabed was sampled by means of a vibrocorer. These samples were used to assist interpretation of sonar and shallow geophysical data. The seabed was also sampled by means of a seabed penetometer. Geodetic Reference System; Geodetic datum - WGS84 Ellipsoid - WGS84 Projection - UTM Zone 30N
Series2011 - 2012, SSE Renewables, Beatrice, Environmental Statement
The Beatrice Environmental Statement contains reports (chapters) and figures from various surveys carried out by consultants employed by SSE Renewables, to assess the likely significant impacts of the wind farm and offshore transmission works (OfTW) on the surrounding area. These reports and figures are backed up by datasets. Included in the Environmental Statement Dataseries are reports on the following; - Physical Processes - Benthic Ecology - Fish and Shellfish Ecology - Marine Mammals - SLVIA - Marine Archaeology and Cultural Heritage - Commercial Fisheries - Airborne Noise - Shipping and Navigation - Aviation and MOD - Socio-economics Recreation and Tourism - OfTW Physical Processes and Geomorphology - OfTW Benthic Ecology - OfTW Fish and Shellfish Ecology - OfTW Marine Mammals - OfTW Ornithology - OfTW Marine Archaeology and Cultural Heritage - OfTW Commercial Fisheries - OfTW Shipping and Navigation The surveys and reporting took place between 2011 and 2012.
2011, Fugro, Beatrice, Initial Geotechnical Survey
Fugro Geoconsulting Limited (FGCLTD) was requested by BOWL to perform a geotechnical investigation at the site to provide soils information to assist in the foundation design of the proposed wind farm. The work was performed from the vessel MV Gargano from 31 December 2010 to 09 January 2011. The objective of this investigation was to provide geotechnical information to assess the soil conditions for the proposed wind farm. The report presents the following information: (i) Details of the geotechnical site investigation, including descriptions of the methods employed for the in-situ testing and sampling; (ii) Results of the offshore in-situ testing and sampling; (iii) Details of the offshore laboratory testing that has been performed (iv) Results of the offshore laboratory testing performed; (v) Preliminary borehole logs and descriptions of the soil strata.
Series2010, Osiris and Senergy, Beatrice, Geophysical Survey
The geophysical survey of Beatrice Offshore Wind Farm Site was undertaken by Osiris Project, commissioned by Senergy Survey & Geoengineering and carried out between 1st April and 21st May 2010. The main objectives were to assess detailed bathymetry, seabed features and shallow soil conditions for input to turbine foundation planning across the site. The survey was carried out in 2 phases; 1st phase incorporated the acquisition of bathymetry, side scan sonar and sub-bottom profiler data; 2nd phase incorporating the acquisition of 2D ultra high resolution (UHR) seismic data only. A Geo-Resources GeoSpark 200 sparker sub-bottom profiling system was used during phase 1 of the survey. 2D UHR seismic data was acquired is a 2.1kJ sparker source, together with a 24 channel streamer. For 1st phase analogue work, the SV Chartwell vessel was equipped with mulitbeam and single beam echo sounders, side scan sonar, sub-bottom profiler and magnetometer systems. Survey operations were commended on 7th April, 1st phase completed on 5th May 2010. 2nd phase UHR seismic data acquisition commenced on 10th May 2010 and was completed on 21st May 2010. Seabed levels range from 35.1m below LAT, close to the south western corner of the development area, to 68.1m below LAT at the extreme north west corner. The results of the Side Scan Sonar indicate that, in general, grandular sediments are present at seabed level across most of the survey area. These deposits are interpreted as ranging from shelly medium to coarse grained sands to medium to coarse grained sands and gravels, with occasional cobbles and boulders. A total of 110 targers were picked from the development area, most of which appear to be isolated large boulders (with a maximum dimension generally >1m). A number of targets are associated with the 'Jacky' infrastructure. The processed sub-bottom profiling data are presented as a series of Isopachyte Charts. The sparker data was mainly utilised for the interpretation of the marine sediments above the seabed multiple, with UHR data mainly below the seabed multiple. The deliverables of the survey were presented as a series of reports and raw and processed data.
Series2010, Partrac, Beatrice, Metocean Survey
Partrac Ltd were contracted to undertake a marine monitoring campaign at locations within the Beatrice Offshore Wind Farm area. The purpose of the monitoring is to inform the developer’s physical processes modelling and engineering design. The survey period required is up to six months in duration. There are three sites for monitoring. The three locations were identified by SSE Renewables for the deployment of metocean equipment within the Beatrice location and required Partrac deploying one Waverider buoy and two seabed-mounted AWACs (Acoustic Wave and Current Profilers). Data from the Waverider buoy are logged to a memory card in each unit and transmitted every hour via the Orbcomm system of low-Earth orbit (LEO) satellites. Waverider data are downloaded at Partrac’s offices, stored and backed up to a remote server every 12 hours. Internally stored data from all instruments are downloaded during every service visit, including any data records which were not transmitted for any reason. ADCP data are logged internally every 10 minutes and are downloaded every month during routine service visits. Deliverables were in the form of reports and raw and processed data.