2014, Calegeo, EDP Renewables, Zone 1 - Moray Firth, Geotechnical Site Investigation

2014, Calegeo, EDP Renewables, Zone 1 - Moray Firth, Geotechnical Site Investigation

Powered by: CES
Don't show this

What is a series page?

Download MEDIN file

Last series update:

September 2026

Collection date:

June 2014 - August 2014

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

September 2026

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Summary

Calegeo was contracted by EDP Renewables (hereinafter referred as the Client) to perform a geotechnical site investigation at the UK Round 3 Moray Offshore Windfarm (OWF) located within the Outer Moray Firth. The geotechnical data will be used to progress the design of the foundation solutions for the wind turbine generators (WTG) and offshore subs...

Categories:
Geotechnical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
3
Reports
3

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

Borehole Locations

Lab Test Results

MORL CPT Data

Select a Package from the list on the left to see more information about it