2011, MORL, Grontmij, Zone 1 - Moray Firth, Substructure and Foundation Concept Engineering Design

2011, MORL, Grontmij, Zone 1 - Moray Firth, Substructure and Foundation Concept Engineering Design

Summary

Moray Offshore Renewables Limited (MORL) is planning to develop 1.5 GW of offshore wind by 2020 within the Moray Firth zone. MORL are conducting a Concept Engineering that is divided into 12 no. Work Packages (WP) covering separate aspects of the wind farm prior to application for consent to the site regulators. The purpose of this document is to present the findings for Work Package 4:Design Basis for Concept Engineering.
Categories
Geotechnical
Development
Zone 1 - Moray Firth
Industry
Wind
Phase
Pre-Consent
Organisation
MORL Substructure and Foundation Concept Engineering Design
Available in this series
1 Dataset, 4 Reports

Data & downloads

Datasets