2014, Natural Power Consultants, Zone 1 - Moray Firth, OfTI Ornithology Update

2014, Natural Power Consultants, Zone 1 - Moray Firth, OfTI Ornithology Update

Powered by: CES
Don't show this

What is a series page?

Download MEDIN file

Last series update:

September 2026

Collection date:

June 2014 - June 2014

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

September 2026

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Summary

In March 2014, the Scottish Government awarded Moray Offshore Renewables Limited (MORL) consent for the construction and operation of 1.116MW of offshore wind generation in the Outer Moray Firth. As part of their consent application, MORL submitted an Environmental Statement (ES) chapter detailing the Offshore Transmission Infrastructure (OfTI). Si...

Categories:
Birds
Environmental Statements
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

Environmental Statement Chapter 04.04

Select a Package from the list on the left to see more information about it