2013, ABPmer, Zone 1 - Moray Firth, Metocean Survey Criteria for Design, Construction, Decommissioning, Operation and Maintenance

2013, ABPmer, Zone 1 - Moray Firth, Metocean Survey Criteria for Design, Construction, Decommissioning, Operation and Maintenance

Powered by: CES
Don't show this

What is a series page?

Download MEDIN file

Last series update:

September 2026

Collection date:

January 1979 - April 2013

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

September 2026

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Summary

The Moray Firth Round 3 Zone is proposed for development by Moray Offshore Renewables Ltd (MORL). The zone covers an area of approximately 524.5km2 and is located, at its closest point, 22.1 km east of the Caithness coastline in the outer Moray Firth on the north east coast of Scotland. The zone is located on the crest and south western flank of th...

Categories:
Metocean
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
5
Reports
4

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

Eastern Development Area Data

Hindcast Wave Time Series Data (Export Cable Route)

Map Packages

Other data

Wave Buoy Locations