2011, Anatec, Zone 1 - Moray Firth, Navigational Risk Assessment

2011, Anatec, Zone 1 - Moray Firth, Navigational Risk Assessment

Powered by: CES
Don't show this

What is a series page?

Download MEDIN file

Last series update:

September 2026

Collection date:

January 2011 - December 2011

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

September 2026

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Summary

Anatec have been commissioned by Moray Offshore Renewables Ltd (MORL) to perform the baseline navigation assessment of the Eastern Development Area located in the Moray Firth, in the North of Scotland. It is planned that the Eastern Development Area will contain three wind farms called Telford, Stevenson and MacColl. The objectives of this work are...

Categories:
Environmental Statements
Shipping and Navigation
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
7
Reports
1

Deep dive in the data

Choose what you wish to look into:

Dataset

|

Report

|

Other

AIS for Export Cable Route

Anchored Vessels Shapefile

Gear Positions Shapefile

Impacted Routes Shapefile

MAIB Incident Shapefiles

RNLI Casualty Shapefiles

Shapefiles and Turbine Co-ordinates Spreadsheet

Select a Package from the list on the left to see more information about it