2013, Fugro, Beatrice, Interim Geotechnical Survey

2013, Fugro, Beatrice, Interim Geotechnical Survey

Summary

Fugro GeoConsulting Limited (Fugro) was contracted to BOWL to perform an interim geotechnical survey at the Beatrice Offshore Wind Farm site to obtain soils information to assist in the design and installation of wind turbine generators along with the associated meteorological mast structures, offshore substation platform and export cables. The first phase of the work was performed from the geotechnical drilling vessel MV Bucentaur from 5 September to 18 September 2013 and the second phase of the work was performed from the geotechnical drilling vessel MV Gargano from 27 September to 4 December 2013 in accordance with instructions received from BOWL.
Categories
Geotechnical
Development
Beatrice
Industry
Wind
Phase
Pre-construction
Organisation
Fugro Geoconsulting Limited