Summary
Partrac Ltd were contracted to undertake a marine monitoring campaign at locations within the Beatrice Offshore Wind Farm area. The purpose of the monitoring is to inform the developer’s physical processes modelling and engineering design. The survey period required is up to six months in duration. There are three sites for monitoring. The three...