2012-2013, Osiris Projects, Brims Tidal Array, Geophysical Survey

2012-2013, Osiris Projects, Brims Tidal Array, Geophysical Survey

Powered by: CES
Don't show this

What is a series page?

Download MEDIN file

Last series update:

September 2024

Collection date:

August 2012 - September 2013

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

September 2024

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Summary

Osiris Projects were commissioned in August 2012 by SSE Renewables, Costa Head Wave Farm Ltd and Brims Tidal Array Ltd to carry out three contractually separate geophysical surveys around Orkney, at Costa Head, Westray South and Brims, to assess the suitability of the locations for the potential installation of wave / tidal generators, beginning wi...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
7
Reports
1