2024, XOCEAN, Moray West Offshore Windfarm, Wind Turbine Generator Debris Survey

2024, XOCEAN, Moray West Offshore Windfarm, Wind Turbine Generator Debris Survey

Powered by: CES
Don't show this

What is a series page?

Download MEDIN file

Last series update:

April 2026

Collection date:

March 2024 - August 2024

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

April 2026

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Summary

Debris clearance surveys following installation of the monopiles and transition pieces at each location, prior to the arrival of a jack-up vessel conducing installation of the Wind Turbine Generator (WTG) assets, to accurately determine water depth and identify all objects or obstructions on the seabed which will influence construction work.
In thi...

Categories:
Engineering Design
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
3
Reports
2