Summary
Debris clearance surveys following installation of the monopiles and transition pieces at each location, prior to the arrival of a jack-up vessel conducing installation of the Wind Turbine Generator (WTG) assets, to accurately determine water depth and identify all objects or obstructions on the seabed which will influence construction work. In thi...
