2021, Fugro, Moray West Offshore Windfarm, Geotechnical Site Investigation

2021, Fugro, Moray West Offshore Windfarm, Geotechnical Site Investigation

Powered by: CES
Don't show this

What is a series page?

Download MEDIN file

Last series update:

February 2026

Collection date:

January 2021 - September 2021

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

February 2026

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Summary

Moray West contracted Fugro GB Marine Limited to provide soils information by carrying out a geotechnical site investigation. The investigation was split into two phases. Phase 1 involved downhole cone penetration testing and seismic velocity testing from the MV Normand Flower from 25/01/2021 to 03/03/2021. Phase 2 involved further testing from the...

Categories:
Geotechnical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
1
Reports
1