2013, Optimised Environments Ltd, Brough Head Wave Farm, SLVIA Method Statement

2013, Optimised Environments Ltd, Brough Head Wave Farm, SLVIA Method Statement

Summary

Optimised Environments Ltd (OPEN) has been appointed to undertake the Seascape, Landscape and Visual Impact Assessment (SLVIA) as part of the EIA for the Outshore Point Wave Farm. The Brough Head Wave Farm project, proposed by Brough Head Wave Farm Limited (BHWFL) is a partnership between renewable technology developer Aquamarine Power Limited (Aquamarine Power) and SSE Renewables UK Limited (SSER). The aim is to develop the first 50 MW of the Brough Head Wave Farm at Outshore Point (herein referred to as ‘the Project’). The Project is located off Mainland Orkney, in the vicinity of Outshore Point between the point of Howana Geo and Marwick Bay.
Categories
Onshore
Development
Brough Head
Industry
Wave
Phase
Pre-construction
Organisation
Optimised Environments Ltd
License
Marine Data Exchange Terms of Use

Data & downloads

Reports