2013, Xodus Ltd., Buchan Deep, Phase 1 Intertidal Survey

2013, Xodus Ltd., Buchan Deep, Phase 1 Intertidal Survey

Powered by: CES
Don't show this

What is a series page?

Download MEDIN file

Last series update:

September 2025

Collection date:

August 2013 - August 2013

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

September 2025

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Summary

To support the development of the Hywind Scotland Pilot Park Project (‘the Project’), Statoil Wind Limited (SWL) is
undertaking an Environmental Impact Assessment (EIA). Part of the EIA will involve the assessment of potential
impacts on intertidal ecology, related to the proposed onshore cable route options at Peterhead. To inform the EIA and to e...

Categories:
Environmental Statements
Intertidal Ecology
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Reports
1