2012-2013, Partrac Ltd, Costa Head, Metocean Survey

2012-2013, Partrac Ltd, Costa Head, Metocean Survey

Summary

Partrac Ltd were contracted by SSE Renewables to deploy two Waverider buoys off Costa Head in the Orkney Island archipelago. The objective of this study was to provide wave data (height, period, direction and spread) for wave power analysis that will inform the developer's physical processes modelling and engineering design in relation to a proposed wave energy development. This report provides wave parameters and wave power analysis for the full deployment between 14th March, 2012 and 20th March, 2013 for Waveriders at two sites, site ST001 and site ST002. An additional comparison between data collected at these sites against concurrent data at ADCP sites ST003 and ST004 is also provided.
Categories
Metocean
Development
Costa Head
Industry
Wave
Phase
Pre-construction
Organisation
Partrac Ltd.
Available in this series
2 Datasets, 4 Reports

Data & downloads

Datasets