2014, PLA, London Array, Princes Channel Bathymetric Consent Survey (January)
Summary
Data & downloads
Datasets
Data Highlights
Related Pages
Series2016, Spectrum Geosurvey, London Array, Export Cable Consent Survey
Spectrum Geosurvey Limited was contracted by London Array Limited (hereinafter ‘the Client’) to survey four export cables (HV1-HV4) during summer 2016. The surveys were performed on board the survey / crew transfer vessel Spectrum 1. The primary objective was to collect high resolution multibeam bathymetry and backscatter data over the defined survey areas. This data was required to provide a comparison with previous datasets and to assess any changes in seabed level and morphology.
Series2016, Spectrum Geosurvey, London Array, Archaeological Consent Survey (Q3)
Spectrum Geosurvey Limited was contracted by London Array Limited (hereinafter ‘the Client’) to survey ten pre-defined areas of archaeological interest across the London Array Offshore Windfarm site and export cable corridor. The surveys were performed on board the survey / crew transfer vessel Spectrum 1. The primary objective was to collect high resolution multibeam bathymetry and backscatter data over the defined survey areas. Data was required to provide a comparison with previous datasets and to assess any changes in seabed level and morphology.
Series2016, Spectrum Geosurvey, London Array, Crossline Consent Survey
Spectrum Geosurvey Limited was contracted by London Array Limited (hereinafter ‘the Client’) to survey six pre-defined corridors across the London Array Offshore Windfarm site including substations 1 and 2. The surveys were performed on board the survey / crew transfer vessel Spectrum 1. The primary objective was to collect high resolution multibeam bathymetry and backscatter data over the defined survey areas. This data was required to provide a comparison with previous datasets and to assess any changes in seabed level and morphology.
Series2015, Spectrum Geosurvey, London Array, Geophysical Consent Surveys Q3-Q4
Spectrum Geosurvey Limited was contracted by London Array Limited (hereinafter ‘the Client’) to perform a three part survey programme to fulfil the consent requirements as determined by the regulator. The three separate components comprised: 1, Export cables survey (HV1-HV4) 2. Crosslines survey, covering six pre-defined transects across the main windfarm site 3. Archaeological surveys, covering ten pre-defined areas of interest The surveys were performed on board the survey / crew transfer vessel Spectrum 1. The primary objective was to collect high resolution multibeam bathymetry and backscatter data over the defined survey areas. Data was required to provide a comparison with previous datasets and to assess any changes in seabed level and morphology.
Series2014, MMT, London Array, Site And Export Cables Bathymetric Survey (Autumn)
As part of the post construction monitoring at the London Array Offshore Wind Farm, a geophysical (bathymetry & backscatter) survey of the 4 export cables (HV1 – HV4), cable crossings, selected WTG locations and array cable corridors at the London Array Wind Farm (LAW01) is required by the authorities. London Array Ltd sees the need to evaluate the asset integrity due to the dynamic seabed environment. At the wind farm site, extensive scour holes of depth up to 9m deep have been observed. The objective of the survey is to accurately map the extent of the scour holes and assess the development since the last survey (April 2014) and the overall development since pre-construction (2010).
Series2014, Ramboll, London Array, Archaeological Review of the Construction Vessel Track Plot Positions for the Phase 1 Wind Farm in Relation to Archaeological Avoidance Blocks
This document is a report on the review of track plot data obtained from vessels involved in the construction of the London Array offshore wind farm Phase 1. The review of the track plot data was undertaken in order to establish the extent to which the avoidance of pre-agreed Archaeological Avoidance Blocks (AABs) over known wrecks and geophysical anomalies on the seabed had been successful during wind farm construction.
Series2014, EGS, London Array, Site And Export Cables Bathymetric Survey (Spring)
The London Array Offshore Wind Farm (OWF) is situated approximately 20 kilometres (km) to the northeast of the Kent coast, within the “Knock Deep” Channel of the Thames Estuary. The OWF consists of 175 Wind Turbine Generators (WTGs) and 2 substations. The export cable route, consisting of four cables, runs for approximately 52km from a landfall site at Seasalter in the Swale to the two substations located on the OWF site. Figure 1 shows an overview of the London Array OWF site and export cable. Both pre-construction and post-construction bathymetric surveys have been carried out on the OWF site and export cable routes since 2010. EGS International Ltd (EGSi) carried out a post-construction bathymetric survey of the export cable in September 2013, in order to monitor changes in seabed morphology against the 2010 pre-construction survey. In Spring 2014, DONG Energy contracted EGSi to carry out a post-construction bathymetric survey of the export cable route, selected WTGs and connecting array cables.
Series2014, Ramboll, London Array, Post-Installation Archaeological Monitoring
This document is a report on the second year (2014) of post-installation archaeological monitoring of geophysical survey data which was acquired during the autumn of 2014 for the turbine array and export cables following the construction of the wind farm. This data was reviewed by the London Array Retained Archaeologists in order to ascertain if post-installation sediment dynamics had had any effect on the Archaeological Avoidance Blocks (AABs) identified and agreed during the consent and construction process, or whether any further potential archaeological material had been exposed by bed movement caused by the wind farm installation.
Series2013-2014, APEM, London Array, Ornithological Aerial Survey
This report summaries the findings of the first post-construction aerial surveys of the birds and marine mammals present in the London Array Limited Offshore Wind Farm (OWF) site (hereby referred to as London Array OWF site) containing Phase 1 development and the associated “control” Zone, surveys carried out during the 2013 / 14 winter.
Series2013, EGS, London Array, Geophysical Export Cable Route Survey
In August 2013 EGS International were commissioned to carry out bathymetric surveys of the London Array Export cable routes. The Bathymetric surveys were to cover the 4 export cables corridor as laid and with a buffer of 25m either side of the outermost cable. The vessel mobilisation was carried out in Ramsgate between 27th and 30th August 2013. The bathymetric survey work was carried out onboard the Wessex Explorer between 27th August and 09th September 2013. The survey equipment was demobilised from the vessel on 9th September 2013 in Ramsgate. Data were collected in ETRS89 Datum with RTK corrections supplied from LAL (Dong London Array) /Dansurvey setup. The VORF model was utilised to reduce data to LAT and for comparative purposes a surface with a fixed offset of 42.1 was also created in order to compare the 2010 and 2013 datasets. Data comparison between the 2010 and 2013 datasets show general movement of sediment in certain areas along the route with the majority of sandwave migration occurring in the outer cable route east of the Kentish flats.
2013 - 2015, MarineSpace, London Array, Year 1 Monitoring Report
MarineSpace Ltd was commissioned by London Array Ltd to undertake a post-construction Annual Monitoring Report (AMR) for the London Array Offshore Wind Farm (OWF). The London Array OWF is located approximately 20 km from the Kent and Essex coasts, on, and between two subtidal sandbanks, Long Sand and Kentish Knock in the outer Thames Estuary. The post-construction AMR summarises the findings of the Year 1 post-construction monitoring surveys that have been conducted within the London Array OWF study area, consisting of the OWF site and along the export cable corridor. The monitoring survey reports that have been summarised within this report are attached as appendices to this document. The monitoring report focusses on the delivery of Marine Licence conditions relevant to post-construction monitoring requirements. The report also addresses specific issues identified as requiring further assessment, or analysis, during future post-construction monitoring surveys. Future monitoring will occur for all receptors and this will provide more detail from which further conclusions can be drawn.
Series2013, PLA, London Array, Bathymetric Consent Survey
The Port of London Authority (PLA) Hydrographic Service was commissioned by DONG Energy to undertake a seabed monitoring survey of a designated section of the four export cable routes from the LAWF that cross the Princes Channel. This series covers survey elements which were undertaken on the 30th April 2013. The survey work was carried out using the PLA survey vessel ‘Yantlet’, with bathymetric data being collected using a hull-mounted Reson SeaBat 8125H MBES.