2015, Spectrum Geosurvey, London Array OFTO, Export Cable Consent Survey Q1 and Q2
Summary
Data & downloads
Datasets
Data Highlights
Related Pages
Series2016, Spectrum Geosurvey, London Array OFTO, Export Cable Consent Survey
Spectrum Geosurvey Limited was contracted to survey the London Array Limited (LAL) Offshore Wind Farm (LAL) export cable routes. The surveys were to cover the four export cable corridors with a 25m corridor from the outermost as built cable routes. This extended to 50 from the outermost as built cable routes at the Kentish Flats/LAL export cable crossings and 100 from the outermost as built cable routes at the BritNed/LAL export cable crossings respectively. The purpose of the survey was primarily to fulfil the consent requirements as determined by the regulator. Multibeam bathymetry and backscatter data was acquired on board the Spectrum 1 between 18th May 2016 and 28th July 2016.
Series2015, Spectrum Geosurvey, London Array OFTO, Export Cable Geophysical Consent Survey Q3
Spectrum Geosurvey Limited was contracted by London Array Limited (hereinafter ‘the Client’) to survey four export cables (HV1-HV4) during autumn 2015. Multibeam bathymetry and backscatter data was acquired on board the Spectrum 1 between 02/08/2015 and 22/08/2015. The primary objective was to collect high resolution multibeam bathymetry and backscatter data over the defined survey area. Data was required to provide a comparison with previous datasets and to assess any changes in seabed level and morphology along the export cable route.
Series2015, MarineSpace, London Array OFTO, Year 1 Monitoring Report
MarineSpace Ltd was commissioned by London Array Ltd to undertake a post-construction Annual Monitoring Report (AMR) for the London Array Offshore Wind Farm (OWF). The London Array OWF is located approximately 20 km from the Kent and Essex coasts, on, and between two subtidal sandbanks, Long Sand and Kentish Knock in the outer Thames Estuary. The post-construction AMR summarises the findings of the Year 1 post-construction monitoring surveys that have been conducted within the London Array OWF study area, consisting of the OWF site and along the export cable corridor. The monitoring survey reports that have been summarised within this report are attached as appendices to this document. The monitoring report focusses on the delivery of Marine Licence conditions relevant to post-construction monitoring requirements. The report also addresses specific issues identified as requiring further assessment, or analysis, during future post-construction monitoring surveys. Future monitoring will occur for all receptors and this will provide more detail from which further conclusions can be drawn.
Series2014, MMT, London Array OFTO, Site And Export Cables Bathymetric Survey
As part of the post construction monitoring at the London Array Offshore Wind Farm, a geophysical (bathymetry & backscatter) survey of the 4 export cables (HV1 – HV4), cable crossings, selected WTG locations and array cable corridors at the London Array Wind Farm (LAW01) is required by the authorities. London Array Ltd sees the need to evaluate the asset integrity due to the dynamic seabed environment. At the wind farm site, extensive scour holes of depth up to 9m deep have been observed. The objective of the survey is to accurately map the extent of the scour holes and assess the development since the last survey (April 2014) and the overall development since pre-construction (2010).
Series2014, EGS, London Array OFTO, Site And Export Cables Bathymetric Survey
The London Array Offshore Wind Farm (OWF) is situated approximately 20 kilometres (km) to the northeast of the Kent coast, within the “Knock Deep” Channel of the Thames Estuary. The OWF consists of 175 Wind Turbine Generators (WTGs) and 2 substations. The export cable route, consisting of four cables, runs for approximately 52km from a landfall site at Seasalter in the Swale to two substations located on the OWF site. Both pre-construction and post-construction bathymetric surveys have been carried out on the OWF site and export cable routes since 2010. EGS International Ltd (EGSi) carried out a post-construction bathymetric survey of the export cable in September 2013, in order to monitor changes in seabed morphology against the 2010 pre-construction survey. In Spring 2014, DONG Energy Wind Power A/S contracted EGSi to carry out a postconstruction bathymetric survey of the export cable route and selected Wind Turbine Generators (WTGs) and connecting array cables.
Series2013, EGS, London Array OFTO, Export Cable Route Survey
In August 2013 EGS International were commissioned to carry out bathymetric surveys of the London Array Export cable routes. The Bathymetric surveys were to cover the 4 export cables corridor as laid and with a buffer of 25m either side of the outermost cable. The vessel mobilisation was carried out in Ramsgate between 27th and 30th August 2013. The bathymetric survey work was carried out onboard the Wessex Explorer between 27th August and 09th September 2013. The survey equipment was demobilised from the vessel on 9th September 2013 in Ramsgate. Data were collected in ETRS89 Datum with RTK corrections supplied from LAL (Dong London Array) /Dansurvey setup. The VORF model was utilised to reduce data to LAT and for comparative purposes a surface with a fixed offset of 42.1 was also created in order to compare the 2010 and 2013 datasets. Data comparison between the 2010 and 2013 datasets show general movement of sediment in certain areas along the route with the majority of sandwave migration occurring in the outer cable route east of the Kentish flats.