Summary
A survey was carried out during April 2010 in order to establish the horizontal position and depth of cover of six inter-array cables, installed by MPI Offshore in May and June 2007 using the LBT1, below mean seabed within the Lynn Offshore Wind Farm (OWF) site. A number of sections of the six inter-array cables were found to be out of specificatio...