2011, RPS, Lynn and Inner Dowsing, Decommisssioning of Meteorological Mast and Trial Pile

2011, RPS, Lynn and Inner Dowsing, Decommisssioning of Meteorological Mast and Trial Pile

Summary

Centrica Renewable Energy Ltd (CREL) on behalf of GLID Wind Farms TopCo Limited (GLID) proposes to decommission and remove the trial pile (test pile) within the Lynn Offshore Wind Farm (OWF) site. The Lynn OWF site lies within the boundary of the Inner Dowsing, Race Bank and North Ridge cSAC. Some of the qualifying features for which this cSAC is proposed under the Habitats Directive are: 'sandbanks which are slightly covered by the sea at all times' and 'reefs', in this case biogenic reefs of the worm Sabellaria spinulosa (JNCC, 2010). Consultation was therefore undertaken with Natural England who advised on using the most recent dataset showing the locations of Annex I habitats within the area, as provided by Earth Sciences & Surveying (EGS) Ltd (EGS, 2011). This information will enable Natural England to provide advice on any nature conservation issues in relation to the interest features of the cSAC.
Categories
Meteorology
Development
Lynn and Inner Dowsing
Industry
Wind
Phase
Post-construction
Organisation
RPS
Available in this series
2 Reports

Data & downloads

Reports