
2010-2011, Brown and May Marine Ltd., Lynn and Inner Dowsing Offshore Wind Farms, Year 2 Post-Construction Potting Survey
Summary
This report details the findings of the 13th to 18th potting survey undertaken in the area relevant to the operational Lynn & Inner Dowsing offshore wind farms. The survey is the Year 2 post construction survey which span across 2010 and 2011.
The survey methodology used replicated that of the previous surveys. This is detailed in the “LID Offshore Wind Farm Post-construction Potting Survey, August 2009, Interim Report (Ref: LIDPPS01)”.
Data & downloads
Datasets
