2017, EGS, Lynn and Inner Dowsing, Post Construction Geophysical Survey

2017, EGS, Lynn and Inner Dowsing, Post Construction Geophysical Survey

Powered by: TCE
Don't show this

What is a series page?

Download MEDIN file

Last series update:

November 2021

Collection date:

September 2017 - September 2017

The collection date represents the period of data collection or study duration. For example: '16/04/2015-05/05/2015'

Publication date:

November 2021

The publication date is the date the series was published on the Marine Data Exchange. For example: '23/04/2017'

Published by:

The Crown Estate

Summary

EGS (International) Limited (EGSi) were contracted by Siemens Gamesa Renewable Energy Ltd to
     undertake the 2017 post-construction geophysical survey of the L and ID OWF turbine locations, array
     cable and export cable routes. The main objective of the survey was to fulfil the L and ID Operations and
     Maintenance requirement by monitori...

Categories:
Geophysical
Categories indicate the area of study or data type the series is associated with. For example, a survey carrying out grab sampling would have the category 'Benthic Ecology', while a desktop study exploring the impact of substation design on bird nesting would have the categories ' Birds, Engineering Design'
Available in this series:
Datasets
5
Reports
4